Material Requirements Planning (MRP) is a computer software based production planning and inventory control system used to manage Manufacturing processes.
An MRP system is intended to simultaneously meet three objectives:
*Ensure materials and products are available for production and delivery to customers. *Maintain the lowest possible level of inventory. *Plan manufacturing activities, delivery schedules and purchasing activities.
=The scope of MRP in manufacturing=
All manufacturing organisations, whatever it is they produce, face the same daily practical problems. They need to control the types and quantities of materials they purchase, plan which products are to be produced and in what quantities and ensure that they are able to meet current and future customer demand, all at the lowest possible cost. Making a bad decision in any of these areas will lose the company money. A few examples are given below:
*If a company purchases insufficient quantities of an item used in manufacturing, or the wrong item, they may be unable to meet contracts to supply products by the agreed date. *If a company purchases excessive quantities of an item, money is being wasted - the excess quantity ties up cash while it remains as stock and may never even be used at all. *Beginning production of an order at the wrong time can mean customer deadlines being missed.
MRP is used by many organisations as a tool to deal with these problems. The questions it provides answers for are: WHAT items are required, HOW MANY are required and WHEN are they required by.
=Inputs and outputs=
Running a report from MRP begins with an estimate of what products will be required in the next time period (an arbitrary length of time, often but not always one week), taken from the master production schedule. The MRP software calculates the times required to manufacture the products, using the factory s estimated time to assemble each product. Then, the system explodes the product into lists of parts required, using the Bill of Materials developed by the engineering department. The parts are ordered at times back-dated (or offset ) from the dates of assembly and the relevant paperwork is generated.
This system works through what are termed inputs and outputs. The inputs are entered into the software, which uses them for processing the outputs. The inputs and outputs essential to an MRP system are as follows:
Inputs
Outputs
There are only two (2) outputs and a variety of messages/reports
Messages and Reports:
Note that the OUTPUTS are RECOMMENDED. Due to a variety of changing conditions in companys, since the last MRP / ERP system Re-Generation, the recommended outputs need to be reviewed by TRAINED people to group orders for benefits in set-up or freight savings. These actions are beyond the linear calculations of the MRP computer software.
MRP/ERP Systems were first introduced by George Plossl and John Orlicky in the late 1960s. Oliver Wight contributed the evolution to MRP2, to include more than the factory production and material needs. ERP evolved with the change in hardware / software capability and Interface interpretations between software.